Line 30: Line 30:
 ===== Preparation of Gas bottles ===== ===== Preparation of Gas bottles =====
  
-  * In Data-U6+==== In Data-U6 ====
       * Ensure I265GV is closed to isolate focal plane vacuum chamber from the rest of the beamline       * Ensure I265GV is closed to isolate focal plane vacuum chamber from the rest of the beamline
       * Confirm that the focal plane chamber is under vacuum       * Confirm that the focal plane chamber is under vacuum
       * Confirm that the only open gas handling system valves are 4, 5, 6, 20, 21, and 22       * Confirm that the only open gas handling system valves are 4, 5, 6, 20, 21, and 22
  
-  * In the S3 vault+==== In the S3 vault ====
       * Ensure that the gas handling system roughing pump is running and has a good vacuum       * Ensure that the gas handling system roughing pump is running and has a good vacuum
            * The pump sits on the floor under the focal plane behind the south support post             * The pump sits on the floor under the focal plane behind the south support post 