===== General Information ===== | ===== General Information ===== | ||
Required controls and monitoring | Required controls and monitoring | ||
- | * LabView gas handling system application | + | |
- | * PanelMate S800vac.MT2 page 07: Focal Plane Detector | + | * PanelMate |
- | The gas handling systems for both Focal Plane gas-filled detectors – the Ion Chamber and the CRDCs – are remotely controlled via a single LabView application running on the computer S800FP-PC in the S3 vault. This computer can be accessed remotely via the devop1 computer in Data-U6. | + | The gas handling systems for both Focal Plane gas-filled detectors – the Ion Chamber and the CRDCs – are remotely controlled via a single LabView application running on the computer |
Note that since the same roughing pump drives the gas handling systems for both gas-filled detectors, extra precautions must be taken to protect one detector from the pressure of the other detector. The fact that the same pump drives both systems is not indicated on the graphics for the LabView control application | Note that since the same roughing pump drives the gas handling systems for both gas-filled detectors, extra precautions must be taken to protect one detector from the pressure of the other detector. The fact that the same pump drives both systems is not indicated on the graphics for the LabView control application | ||
Line 25: | Line 25: | ||
* Once both detectors are empty, this application can be closed with the “X” button on the upper right corner of the window. | * Once both detectors are empty, this application can be closed with the “X” button on the upper right corner of the window. | ||
- | {{: | + | {{: |
Line 139: | Line 139: | ||
* Wait for the pressure in both detectors as indicated by the displays labeled P.T. #1 and P.T. #2 to reach 0.5 Torr or less; this process will take at least an hour | * Wait for the pressure in both detectors as indicated by the displays labeled P.T. #1 and P.T. #2 to reach 0.5 Torr or less; this process will take at least an hour | ||
- | * Close valves | + | * Close **valves |
- | * Close valves | + | * Close **valves |
- | * Open valves | + | * Open **valves |
* Enter vault and close main valves on gas bottles: | * Enter vault and close main valves on gas bottles: |