This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
gas_handling_system [2013/12/14 16:12] pereira |
gas_handling_system [2013/12/14 16:15] pereira [In Data-U6] |
||
---|---|---|---|
Line 31: | Line 31: | ||
==== In Data-U6 ==== | ==== In Data-U6 ==== | ||
- | * Ensure I265GV is closed to isolate focal plane vacuum chamber from the rest of the beamline | + | * Ensure |
* Confirm that the focal plane chamber is under vacuum | * Confirm that the focal plane chamber is under vacuum | ||
* Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22** | * Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22** |