gas_handling_system [2013/12/14 16:14]
pereira [In Data-U6]
gas_handling_system [2013/12/14 16:18]
pereira [Removing Gas from Focal Plane Detectors]
Line 31: Line 31:
  
 ==== In Data-U6 ==== ==== In Data-U6 ====
-      * Ensure **I265GV** is closed (in Panel Mate S800vac.MT2 page 07) to isolate focal plane vacuum chamber from the rest of the beamline+      * Ensure **I265GV** is closed (in PanelMate **S800vac.MT2 page 07**) to isolate focal plane vacuum chamber from the rest of the beamline
       * Confirm that the focal plane chamber is under vacuum       * Confirm that the focal plane chamber is under vacuum
       * Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22**       * Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22**
Line 51: Line 51:
   * Follow instructions under [[#Preparation of Gas bottles|Preparation of Gas bottles]]    * Follow instructions under [[#Preparation of Gas bottles|Preparation of Gas bottles]] 
  
-  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr.+  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge in PanelMate **S800vac.MT2 page 07**) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr.
  
   * Confirm that the detector pressure as indicated by the display labeled P.T. #1 reads below a couple of Torr   * Confirm that the detector pressure as indicated by the display labeled P.T. #1 reads below a couple of Torr
Line 81: Line 81:
   * Follow instructions under [[#Preparation of Gas bottles|Preparation of Gas bottles]]   * Follow instructions under [[#Preparation of Gas bottles|Preparation of Gas bottles]]
  
-  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr.+  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge in PanelMate **S800vac.MT2 page 07**) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr.
  
   * Confirm that the detector pressure as indicated by the display labeled P.T. #2 reads below a couple of Torr   * Confirm that the detector pressure as indicated by the display labeled P.T. #2 reads below a couple of Torr
Line 113: Line 113:
 ===== Removing Gas from Focal Plane Detectors ===== ===== Removing Gas from Focal Plane Detectors =====
  
-  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge) while gas is being removed from detectors; the pressure normally stays below 5E-5 Torr+  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge in PanelMate **S800vac.MT2 page 07**) while gas is being removed from detectors; the pressure normally stays below 5E-5 Torr
  
   * Ensure that the system is in the normal state for flowing gas through the detectors   * Ensure that the system is in the normal state for flowing gas through the detectors