User Tools

Site Tools


gas_handling_system

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
gas_handling_system [2013/12/26 14:40]
pereira [In the S3 vault]
gas_handling_system [2013/12/26 14:43]
pereira [In the S3 vault]
Line 46: Line 46:
            * The bottle supplying isobutane (C<sub>4</sub>H<sub>10</sub>) for the CRDCs is secured to the south support post for the focal plane chamber. It sits on a scale for monitoring the isobutane consumption – the electronic display for the scale sits on the chiller unit under the focal plane chamber. It has a mechanical pressure gauge downstream of the regulator.             * The bottle supplying isobutane (C<sub>4</sub>H<sub>10</sub>) for the CRDCs is secured to the south support post for the focal plane chamber. It sits on a scale for monitoring the isobutane consumption – the electronic display for the scale sits on the chiller unit under the focal plane chamber. It has a mechanical pressure gauge downstream of the regulator. 
  
-{{:wiki:gas-bottle1.jpg?500|Computer u6pc5 (data-U6) to operate S800.}}+{{:wiki:gas-bottle3.jpg?300}} 
 +{{:wiki:gas-bottle1.jpg?300}}
  
 ===== Filling Ion Chamber with Gas ===== ===== Filling Ion Chamber with Gas =====
gas_handling_system.txt · Last modified: 2023/05/11 11:29 by pereira