This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
gas_handling_system [2013/12/26 14:53] pereira [Filling CRDC1 and CRDC2 with Gas] |
gas_handling_system [2013/12/26 14:54] pereira [Removing Gas from Focal Plane Detectors] |
||
---|---|---|---|
Line 148: | Line 148: | ||
* Open **valves 6 and 22** | * Open **valves 6 and 22** | ||
- | * Enter vault and close main valves on gas bottles: | + | * Enter S3 vault and close main valves on [[Preparation of gas bottles|gas bottles]]: P-10 for Ion Chamber isobutane (C< |