gas_handling_system [2014/11/17 14:57]
pereira [General Information]
gas_handling_system [2014/11/18 11:19]
pereira
Line 31: Line 31:
  
 ==== In Data-U6 ==== ==== In Data-U6 ====
-      * Ensure **I265GV** is closed (in PanelMate **S800vac.MT2 page 07**) to isolate focal plane vacuum chamber from the rest of the beamline+      * Ensure **I265GV** is closed (in PanelMate **S800vac.ui page 07**) to isolate focal plane vacuum chamber from the rest of the beamline
       * Confirm that the focal plane chamber is under vacuum       * Confirm that the focal plane chamber is under vacuum
       * Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22**       * Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22**
Line 150: Line 150:
   * Enter S3 vault and close main valves on [[#Preparation of gas bottles|gas bottles]]: P-10 for the [[Detectors#Ionization Chamber|ionization chamber]] (C<sub>4</sub>H<sub>10</sub>) and CF<sub>4</sub> (tetrafluoromethane) for the [[Detectors#Cathode Readout Drift Chambers (CRDC)|CRDCs]]    * Enter S3 vault and close main valves on [[#Preparation of gas bottles|gas bottles]]: P-10 for the [[Detectors#Ionization Chamber|ionization chamber]] (C<sub>4</sub>H<sub>10</sub>) and CF<sub>4</sub> (tetrafluoromethane) for the [[Detectors#Cathode Readout Drift Chambers (CRDC)|CRDCs]] 
  
 +===== Tracking Gas bottles pressures =====
 +
 +**NEEDS TO BE COMPLETED**
  
  
  
  