This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
gas_handling_system [2014/11/18 11:06] pereira [In Data-U6] |
gas_handling_system [2014/11/18 11:37] pereira [Filling Ion Chamber with Gas] |
||
---|---|---|---|
Line 54: | Line 54: | ||
* Follow instructions under [[# | * Follow instructions under [[# | ||
- | * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge in PanelMate **S800vac.MT2 page 07**) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr. | + | * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge in PanelMate **S800vac.ui page 07**) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr. |
* Confirm that the detector pressure as indicated by the display labeled P.T. #1 reads below a couple of Torr | * Confirm that the detector pressure as indicated by the display labeled P.T. #1 reads below a couple of Torr | ||
Line 150: | Line 150: | ||
* Enter S3 vault and close main valves on [[# | * Enter S3 vault and close main valves on [[# | ||
+ | ===== Tracking Gas bottles pressures ===== | ||
+ | |||
+ | **NEEDS TO BE COMPLETED** | ||