User Tools

Site Tools


gas_handling_system

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
gas_handling_system [2014/11/18 11:19]
pereira
gas_handling_system [2014/11/18 11:37]
pereira [Filling Ion Chamber with Gas]
Line 54: Line 54:
   * Follow instructions under [[#Preparation of Gas bottles|Preparation of Gas bottles]]    * Follow instructions under [[#Preparation of Gas bottles|Preparation of Gas bottles]] 
  
-  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge in PanelMate **S800vac.MT2 page 07**) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr.+  * Monitor the pressure of the focal plane vacuum chamber (as read out via the I264IG ion gauge in PanelMate **S800vac.ui page 07**) while detectors are being filled with gas; the pressure normally stays below 5E-5 Torr.
  
   * Confirm that the detector pressure as indicated by the display labeled P.T. #1 reads below a couple of Torr   * Confirm that the detector pressure as indicated by the display labeled P.T. #1 reads below a couple of Torr
gas_handling_system.txt ยท Last modified: 2023/05/11 11:29 by pereira