This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
gas_handling_system [2017/01/31 12:17] pereira [Filling CRDC1 and CRDC2 with Gas] |
gas_handling_system [2017/01/31 12:18] pereira [Filling Ion Chamber with Gas] |
||
---|---|---|---|
Line 81: | Line 81: | ||
* Click button labeled **Return to AUTO Mode** on left to start filling/ | * Click button labeled **Return to AUTO Mode** on left to start filling/ | ||
* Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system to monitor filling. The flow readings for MFC #1 will increase and eventually disappear as the readout value overflows the display field (this is normal behavior) | * Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system to monitor filling. The flow readings for MFC #1 will increase and eventually disappear as the readout value overflows the display field (this is normal behavior) | ||
- | * If necessary, the filling process can be stopped at any time by pressing the valve button labeled **Close MFC #1** | ||
* Open **valve 9** | * Open **valve 9** | ||
+ | * If necessary, the filling process can be stopped at any time by pressing the valve button labeled **Close MFC #1** | ||
* The filling process will take several minutes | * The filling process will take several minutes | ||