User Tools

Site Tools


gas_handling_system

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
gas_handling_system [2017/05/14 10:05]
pereira [Filling CRDC1 and CRDC2 with Gas]
gas_handling_system [2017/06/07 13:13]
pereira [Removing Gas from Focal Plane Detectors]
Line 158: Line 158:
   * Open **valves 6 and 22**   * Open **valves 6 and 22**
  
-  * Enter S3 vault and close main valves on [[#Preparation of gas bottles|gas bottles]]: P-10 for the [[Detectors#Ionization Chamber|ionization chamber]] (C<sub>4</sub>H<sub>10</sub>) and CF<sub>4</sub> (tetrafluoromethane) for the [[Detectors#Cathode Readout Drift Chambers (CRDC)|CRDCs]] +  * Enter S3 vault and close valves downstream of regulator in [[#Preparation of gas bottles|gas bottles]]: P-10 for the [[Detectors#Ionization Chamber|ionization chamber]] (C<sub>4</sub>H<sub>10</sub>) and CF<sub>4</sub> (tetrafluoromethane) for the [[Detectors#Cathode Readout Drift Chambers (CRDC)|CRDCs]] 
  
 ===== Tracking Gas bottles pressures ===== ===== Tracking Gas bottles pressures =====
gas_handling_system.txt ยท Last modified: 2023/05/11 11:29 by pereira