This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
gas_handling_system [2017/05/14 10:05] pereira [Filling CRDC1 and CRDC2 with Gas] |
gas_handling_system [2017/06/07 13:15] pereira |
||
---|---|---|---|
Line 50: | Line 50: | ||
* The display unit for the pressure at the pump has a needle indicator and is mounted under the [[Stations# | * The display unit for the pressure at the pump has a needle indicator and is mounted under the [[Stations# | ||
* Ensure that the main valves on the gas bottles are open (see pictures below) | * Ensure that the main valves on the gas bottles are open (see pictures below) | ||
+ | * Open valves downstream of regulators in each bottle | ||
* Ensure that the gas bottles are not empty | * Ensure that the gas bottles are not empty | ||
* The gas regulators are not normally adjusted. They should all be set to provide a pressure around 20 psi | * The gas regulators are not normally adjusted. They should all be set to provide a pressure around 20 psi | ||
Line 158: | Line 159: | ||
* Open **valves 6 and 22** | * Open **valves 6 and 22** | ||
- | * Enter S3 vault and close main valves | + | * Enter S3 vault and close valves |
===== Tracking Gas bottles pressures ===== | ===== Tracking Gas bottles pressures ===== |