This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
gas_handling_system [2018/04/09 11:23] pereira [General Information] |
gas_handling_system [2018/04/09 12:35] pereira [Filling CRDC1 and CRDC2 with Gas] |
||
---|---|---|---|
Line 157: | Line 157: | ||
* Close **valves 8 and 24** | * Close **valves 8 and 24** | ||
- | * Open **valves 6 and 22** | + | * Open **valves 6, 7, 22 and 23** |
- | * Enter S3 vault and close valves downstream of regulators in [[# | + | * Enter S3 vault and close valves downstream of regulators in [[# |
===== Tracking Gas bottles pressures ===== | ===== Tracking Gas bottles pressures ===== |