====== Detector gas handling system ====== | ====== Detector gas handling system ====== | ||
- | * [[#General information]] | + | * [[#General information |
- | * [[#LabView Control Program]] | + | * [[#LabView Control Program |
- | * [[#Preparation of Gas bottles|Preparation of Gas bottles for filling of detectors]] | + | * [[# |
* [[#Filling Ion Chamber with Gas]] | * [[#Filling Ion Chamber with Gas]] | ||
* [[#Filling CRDC1 and CRDC2 with Gas]] | * [[#Filling CRDC1 and CRDC2 with Gas]] | ||
Line 9: | Line 9: | ||
* [[#Tracking Gas bottles pressures|Tracking Gas bottles pressures from Barney]] | * [[#Tracking Gas bottles pressures|Tracking Gas bottles pressures from Barney]] | ||
* [[# | * [[# | ||
+ | * [[Venting/ | ||
+ | ===== General Information for focal-plane gas handling system ===== | ||
+ | The gas handling systems for both Focal Plane gas-filled detectors – the [[Detectors# | ||
+ | |||
+ | Note that since the same roughing pump drives the gas handling systems for both gas-filled detectors, extra precautions must be taken to protect one detector from the pressure of the other detector. The fact that the same pump drives both systems is not indicated on the graphics for the LabView control application | ||
- | ===== General Information ===== | ||
Required controls and monitoring | Required controls and monitoring | ||
* LabView gas handling system application **FPGHS_TCPIP-II.vi** | * LabView gas handling system application **FPGHS_TCPIP-II.vi** | ||
* PanelMate **S800vac.ui page 07**: Focal Plane Detector | * PanelMate **S800vac.ui page 07**: Focal Plane Detector | ||
- | The gas handling systems for both Focal Plane gas-filled detectors – the [[Detectors# | + | ===== LabView Control Program |
- | + | ||
- | Note that since the same roughing pump drives the gas handling systems for both gas-filled detectors, extra precautions must be taken to protect one detector from the pressure of the other detector. The fact that the same pump drives both systems is not indicated on the graphics for the LabView control application | + | |
- | + | ||
- | ===== LabView Control Program ===== | + | |
To start the gas handling system control application, | To start the gas handling system control application, | ||
Line 37: | Line 37: | ||
- | ===== Preparation of Gas bottles ===== | + | ===== Preparation of Gas bottles |
==== In Data-U6 ==== | ==== In Data-U6 ==== | ||
* Ensure **I265GV** is closed (in PanelMate **S800vac.ui page 07**) to isolate focal plane vacuum chamber from the rest of the beamline | * Ensure **I265GV** is closed (in PanelMate **S800vac.ui page 07**) to isolate focal plane vacuum chamber from the rest of the beamline | ||
* Confirm that the focal plane chamber is under vacuum | * Confirm that the focal plane chamber is under vacuum | ||
- | * Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22** | + | * Confirm that the only open gas handling system valves are **4, 5, 6, 7, 20, 21, 22 and 23** |
* (Check section on [[vacuum control|vacuum control]] for further details.) | * (Check section on [[vacuum control|vacuum control]] for further details.) | ||
Line 72: | Line 72: | ||
* Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | * Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | ||
- | * Close **valve 6** | + | * Close **valves |
* Open **valve 2**; the flow reading at MFC #1 should jump momentarily | * Open **valve 2**; the flow reading at MFC #1 should jump momentarily | ||
Line 103: | Line 103: | ||
* Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | * Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | ||
- | * Close **valve 22** | + | * Close **valves |
* Open **valves 10 and 15** | * Open **valves 10 and 15** | ||
Line 142: | Line 142: | ||
* Open **valves 5 and 21** | * Open **valves 5 and 21** | ||
- | * **IMPORTANT:** CLOSE **VALVE 25** to protect CRDCs from Ion Chamber pressure | + | * **IMPORTANT**: Before opening valve 8 (next step), |
* Empty Ion Chamber to a pressure at or below the pressure of the CRDCs | * Empty Ion Chamber to a pressure at or below the pressure of the CRDCs | ||
Line 157: | Line 157: | ||
* Close **valves 8 and 24** | * Close **valves 8 and 24** | ||
- | * Open **valves 6 and 22** | + | * Open **valves 6, 7, 22 and 23** |