This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
gas_handling_system [2018/04/09 12:06] pereira [In Data-U6] |
gas_handling_system [2018/04/09 12:07] pereira [Filling CRDC1 and CRDC2 with Gas] |
||
---|---|---|---|
Line 72: | Line 72: | ||
* Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | * Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | ||
- | * Close **valve 6** | + | * Close **valves |
* Open **valve 2**; the flow reading at MFC #1 should jump momentarily | * Open **valve 2**; the flow reading at MFC #1 should jump momentarily | ||
Line 103: | Line 103: | ||
* Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | * Click the **Valves** tab at the top of the LabView window to return to the overview display of the gas handling system | ||
- | * Close **valve 22** | + | * Close **valve 22 and 23** |
* Open **valves 10 and 15** | * Open **valves 10 and 15** |