Line 42: Line 42:
       * Ensure **I265GV** is closed (in PanelMate **S800vac.ui page 07**) to isolate focal plane vacuum chamber from the rest of the beamline       * Ensure **I265GV** is closed (in PanelMate **S800vac.ui page 07**) to isolate focal plane vacuum chamber from the rest of the beamline
       * Confirm that the focal plane chamber is under vacuum       * Confirm that the focal plane chamber is under vacuum
-      * Confirm that the only open gas handling system valves are **4, 5, 6, 7, 20, 21, 22 and 23**+      * Confirm that the only open gas handling system valves are **4, 5, 6, 20, 21, and 22**
       * (Check section on [[vacuum control|vacuum control]] for further details.)       * (Check section on [[vacuum control|vacuum control]] for further details.)
  