This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
installation_fp_sci [2015/05/04 12:38] pereira [Installation of FP scintillator] |
installation_fp_sci [2015/05/04 12:55] pereira [Installation of FP scintillator] |
||
---|---|---|---|
Line 18: | Line 18: | ||
==== Installation of FP scintillator ==== | ==== Installation of FP scintillator ==== | ||
- | - In order to remove | + | - The figure below shows the FP chamber open, with the " |
+ | - Unplug | ||
+ | - Using an allen wrench, unscrew the two bolts attaching the scintillator frame to the base of the chamber {{: | ||
+ | - Climb to the chamber and pull the scintillator frame up. Once unplugged, handle it to a second person {{: | ||
+ | - With the help of a second person, hold the new scintillator by its frame and place it in the right spot. A second person should be ready to screw the frame to the base of the chamber | ||
+ | - Connect the bases of the up and down phototubes. The later is quite difficult because one cannot see the pins | ||
+ | - Using a plastic tie, attach the cable of the up phototube to the scintillator frame | ||
- | - | ||
Line 25: | Line 31: | ||
- | + | In order to remove the " | |
Click Vent status [start pumpdown] --> vent status= pumpdown in progress (blue) | Click Vent status [start pumpdown] --> vent status= pumpdown in progress (blue) |