installation_fp_sci [2015/05/04 12:40] pereira [Installation of FP scintillator] |
installation_fp_sci [2015/05/04 12:45] pereira [Installation of FP scintillator] |
||
---|---|---|---|
Line 19: | Line 19: | ||
==== Installation of FP scintillator ==== | ==== Installation of FP scintillator ==== | ||
- The figure below shows the FP chamber open, with the " | - The figure below shows the FP chamber open, with the " | ||
- | - Un | + | - Unplug the bases of the up and down phototubes. The platic tie holding the cable of the up phototube to the chamber needs to be cut |
+ | {{: | ||
Line 25: | Line 26: | ||
- | In order to remove the " | + | In order to remove the " |
Click Vent status [start pumpdown] --> vent status= pumpdown in progress (blue) | Click Vent status [start pumpdown] --> vent status= pumpdown in progress (blue) |