installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
installation_fp_sci [2015/05/04 12:55]
pereira [Installation of FP scintillator]
installation_fp_sci [2017/03/06 12:25]
pereira [Vent focal-plane chamber]
Line 2: Line 2:
  
 ==== Vent focal-plane chamber ==== ==== Vent focal-plane chamber ====
 +  - After venting the FP chamber, there might still be some pressure differencial. This can be corrected by "forcing" the chamber flange {{:wiki:screwdriver-flange.jpg?350}}
   - Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased   - Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased
   - Open the [[gas_handling_system#labview_control_program|Labview gas handling system]] and verify that there is no gas in the CRDCs and IC. Open valves **4** (IC supply), **5** (IC bypass), **6** (IC focal-plane bypass), **20** (CRDC supply), **21** (CRDC bypass), and **22** (CRDC focal-plane bypass). The rest of the valves should be closed   - Open the [[gas_handling_system#labview_control_program|Labview gas handling system]] and verify that there is no gas in the CRDCs and IC. Open valves **4** (IC supply), **5** (IC bypass), **6** (IC focal-plane bypass), **20** (CRDC supply), **21** (CRDC bypass), and **22** (CRDC focal-plane bypass). The rest of the valves should be closed
-  - Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below)  {{:wiki:fp-venting-valve-Daniel.jpg?350|FP chamber manual venting valve}} {{:wiki:fp-venting-valve.jpg?350|FP chamber manual venting valve}} +  - Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below)  {{:wiki:fp-venting-valve-Daniel.jpg?350|FP chamber manual venting valve}} {{:wiki:fp-venting-valve.jpg?350|FP chamber manual venting valve}} 
 +  - Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]])
   - Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates. Go to page 07, click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display "OPEN". The pressure should remain constant because the manual venting valve is still closed   - Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates. Go to page 07, click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display "OPEN". The pressure should remain constant because the manual venting valve is still closed
-  - Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~torr/min     {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}}+  - Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~torr every 15 seconds (see figures below) {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}} 
   - Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read atmospheric pressure. The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"   - Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read atmospheric pressure. The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"
  
Line 17: Line 19:
  
  
-==== Installation of FP scintillator ====+==== Installing FP scintillator ==== 
   - The figure below shows the FP chamber open, with the "old" FP scintillator to be replaced by the new one {{:wiki:E1-view.jpg?350|FP chamber opened}}   - The figure below shows the FP chamber open, with the "old" FP scintillator to be replaced by the new one {{:wiki:E1-view.jpg?350|FP chamber opened}}
   - Unplug the bases of the up and down phototubes. The platic tie holding the cable of the up phototube to the chamber needs to be cut {{:wiki:e1-up-Daniel.jpg?400|UP base phototube}}   {{:wiki:e1-down-closeup.jpg?250|DOWN base phototube}}   - Unplug the bases of the up and down phototubes. The platic tie holding the cable of the up phototube to the chamber needs to be cut {{:wiki:e1-up-Daniel.jpg?400|UP base phototube}}   {{:wiki:e1-down-closeup.jpg?250|DOWN base phototube}}
Line 25: Line 28:
   - Connect the bases of the up and down phototubes. The later is quite difficult because one cannot see the pins   - Connect the bases of the up and down phototubes. The later is quite difficult because one cannot see the pins
   - Using a plastic tie, attach the cable of the up phototube to the scintillator frame   - Using a plastic tie, attach the cable of the up phototube to the scintillator frame
-  -  
- 
  
-he first step to do is unplugging the up and down bases of the phototubes  
  
  
-In order to remove the "old" scintillator, we need first to u 
  
  
-Click Vent status [start pumpdown] --> vent statuspumpdown in progress (blue)+==== Closing focal-plane chamber ==== 
 +  - Turn the switch to move the chamber to position "UP", and keep it that way for about 10 minutes (the time it takes the chamber to be closed) 
 +  - When the chamber is almost close, turn the know to close the clamps 
 +  - Before pumping the chamber down, make sure that the scintillator is properly connected. This can be done by biasing the detector and checking the signals, either from the scalers or with a scope. One should clearly see cosmic rays; if that is not the case, the phototubes are likely miss connected 
 +  - In order to pumpdown the chamber, make sure that the manual vent valve is closed. Start manual pump to get a pressure below 50 mtorr {{:wiki:ManualValve-fp.jpg?350|Manual valve pump}} 
 +  - Close the manual pump; open PanelMate **S800vac** and go to page 07. Select window **PUMPDOWN STATUS** and click on button **START PUMPDOWN**. The **PUMPDOWN STATUS** and **VENT STATUS** windows should display "PUMPDOWN IN PROGRESS" 
 +  - Wait for some hours until vacuum is good