User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
installation_fp_sci [2017/03/06 12:19]
pereira [Vent focal-plane chamber]
installation_fp_sci [2017/03/06 12:25]
pereira [Vent focal-plane chamber]
Line 2: Line 2:
  
 ==== Vent focal-plane chamber ==== ==== Vent focal-plane chamber ====
 +  - After venting the FP chamber, there might still be some pressure differencial. This can be corrected by "forcing" the chamber flange {{:wiki:screwdriver-flange.jpg?350}}
   - Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased   - Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased
   - Open the [[gas_handling_system#labview_control_program|Labview gas handling system]] and verify that there is no gas in the CRDCs and IC. Open valves **4** (IC supply), **5** (IC bypass), **6** (IC focal-plane bypass), **20** (CRDC supply), **21** (CRDC bypass), and **22** (CRDC focal-plane bypass). The rest of the valves should be closed   - Open the [[gas_handling_system#labview_control_program|Labview gas handling system]] and verify that there is no gas in the CRDCs and IC. Open valves **4** (IC supply), **5** (IC bypass), **6** (IC focal-plane bypass), **20** (CRDC supply), **21** (CRDC bypass), and **22** (CRDC focal-plane bypass). The rest of the valves should be closed
Line 7: Line 8:
   - Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]])   - Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]])
   - Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates. Go to page 07, click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display "OPEN". The pressure should remain constant because the manual venting valve is still closed   - Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates. Go to page 07, click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display "OPEN". The pressure should remain constant because the manual venting valve is still closed
-  - Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~1 torr every 15 seconds {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}}+  - Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~1 torr every 15 seconds (see figures below) {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}} 
   - Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read atmospheric pressure. The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"   - Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read atmospheric pressure. The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"
  
installation_fp_sci.txt ยท Last modified: 2023/08/18 10:19 by noji