Line 6: | Line 6: | ||
* Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) | * Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) | ||
* Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]]) | * Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]]) | ||
- | * Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates. Go to page 07, click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display " | + | * Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates. Go to page 07, and ensure that I265GV (gate valve separating FP box from rest of beam line) is closed. |
+ | * Click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display " | ||
* Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~1 torr every 15 seconds (see figures below) | * Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~1 torr every 15 seconds (see figures below) | ||
{{: | {{: |