User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
installation_fp_sci [2017/06/20 10:44]
pereira [Vent focal-plane chamber]
installation_fp_sci [2017/06/20 15:31]
pereira [Vent focal-plane chamber]
Line 11: Line 11:
 {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}}  {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}} 
   * Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read slightly above atmospheric pressure (due to the dry N2 flow pumped to the chamber). The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"   * Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read slightly above atmospheric pressure (due to the dry N2 flow pumped to the chamber). The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"
-  * When the chamber is fully vented, close the manual vent valve+  * When the chamber is fully vented, select **VENT STATUS** and click **STOP VENTING PROCEDURE**  
 +  * Close the manual vent valve
  
 ===== Open focal-plane chamber ===== ===== Open focal-plane chamber =====
installation_fp_sci.txt · Last modified: 2023/08/18 10:19 by noji