installation_fp_sci [2019/07/01 08:59] pereira [Vent focal-plane chamber] |
installation_fp_sci [2019/07/01 09:03] pereira [Vent focal-plane chamber] |
||
---|---|---|---|
Line 9: | Line 9: | ||
* Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) | * Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) | ||
* Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]]) | * Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]]) | ||
- | * Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates, | + | * Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates, |
+ | {{:wiki:NewPanelMate-S800FPVac.jpg?750|Panel Mate Vacuum | ||
* Close I265GV (gate valve separating FP box from rest of beam line) is closed. | * Close I265GV (gate valve separating FP box from rest of beam line) is closed. | ||
* Click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display " | * Click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display " |