User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
installation_fp_sci [2023/02/13 12:05]
noji Updated descriptions about the FP GHS based upon "S800 Focal Plane Gas Handling System Operation Manual" (v3) provided by Jorge to SN on 2/12/2023.
installation_fp_sci [2023/05/08 16:39]
noji
Line 16: Line 16:
   - Click **Enable Controls** for the CRDC and IC Control Valve PIDs and then click **DISABLE** for each of them. This will open the control valve to 100% for each vessel and begin pumping them out.   - Click **Enable Controls** for the CRDC and IC Control Valve PIDs and then click **DISABLE** for each of them. This will open the control valve to 100% for each vessel and begin pumping them out.
   - The IC vessel has a much larger quantity of gas compared to the CRDC vessel. In order to pump them out at a similar speed go to the “FP_State_Buttons” page and go to the D2708 (IC vessel) tab. Click **MAN** to enable manual mode. Click **OPN** for “S800_GHS:SV_D2708:OPN_CMD_10” to open an additional valve to the pump.   - The IC vessel has a much larger quantity of gas compared to the CRDC vessel. In order to pump them out at a similar speed go to the “FP_State_Buttons” page and go to the D2708 (IC vessel) tab. Click **MAN** to enable manual mode. Click **OPN** for “S800_GHS:SV_D2708:OPN_CMD_10” to open an additional valve to the pump.
-  - Open a data browser and plot the PVs for PT1 and PT2. +  - Open a data browser and plot the PVs for PT1 (S800_GHS:CMG_D2708A:VP_RD) and PT2 (S800_GHS:CMG_D2703A:VP_RD)
   - Wait for PT1 and PT2 to read < 2 Torr. This should take about 30 minutes.   - Wait for PT1 and PT2 to read < 2 Torr. This should take about 30 minutes.
  
 ===== Venting FP Chamber ===== ===== Venting FP Chamber =====
   - Ensure the IG in the Focal Plane Pumping Station is off. This page can be found in FRIB EXP Main → S800 → Vacuum Main (Primary Pages) → Focal Plane.   - Ensure the IG in the Focal Plane Pumping Station is off. This page can be found in FRIB EXP Main → S800 → Vacuum Main (Primary Pages) → Focal Plane.
-  - Return to the “FP_State_Buttons” page and under the D2708 tab click **AUTO**. This will close all valves and allow the system to enter Vent mode+  - Return to the “FP_State_Buttons” page and for each of the D2708 and D2703 tabs click **PUMP**.  
-  - Click **VENT**. This will expose the vessels to the Pumping Station. Observe the FPG on the “D2430 Pumping Station” page to ensure the Turbo Pump is not overloaded.+  - Click **VENT** for each tab. This will expose the vessels to the Pumping Station. Observe the FPG on the “D2686 Pumping Station” page to ensure the Turbo Pump is not overloaded.
   - Once the FPG bottoms out, check the box next to “Valve Controls”, then click **Close** next to the Turbo Gate Valve (TGV).    - Once the FPG bottoms out, check the box next to “Valve Controls”, then click **Close** next to the Turbo Gate Valve (TGV). 
   - If the system will only be vented for a short time, leave the TMP on, otherwise turn it off.   - If the system will only be vented for a short time, leave the TMP on, otherwise turn it off.
-  - Plot PT1, PT2, and PT3 from the “GHS_FP_Main” page as well as BPG from the “D2430 Pumping Station” page on the same axis.+  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and PT3 (S800_GHS:CMG_D2708C:VP_RD) from the “GHS_FP_Main” page as well as BPG (RBT_BTS34:BPG_D2686:VP_RD) from the “D2686 Pumping Station” page on the same axis.
   - Briefly (~2 seconds) open the vent valve by clicking **Open** next to the valve labeled “Vent” then click **Close**. Check that all the pressures are increasing at the same rate.   - Briefly (~2 seconds) open the vent valve by clicking **Open** next to the valve labeled “Vent” then click **Close**. Check that all the pressures are increasing at the same rate.
   - Again, open the vent valve and observe the pressure for 30 seconds to ensure the pressures are increasing at the same rate among all four gauges. If a difference of > 1 Torr is observed between any two gauges, click **Close** on the vent valve.   - Again, open the vent valve and observe the pressure for 30 seconds to ensure the pressures are increasing at the same rate among all four gauges. If a difference of > 1 Torr is observed between any two gauges, click **Close** on the vent valve.
Line 38: Line 38:
   - Open “Focal Plane Pumping Station” page from FRIB EXP Main → S800 → Vacuum Main (Primary Pages).   - Open “Focal Plane Pumping Station” page from FRIB EXP Main → S800 → Vacuum Main (Primary Pages).
   - Open “GHS_FP_Main” and “FP_State_Buttons” pages from FRIB EXP Main → S800 → GHS Pages (Secondary Pages).   - Open “GHS_FP_Main” and “FP_State_Buttons” pages from FRIB EXP Main → S800 → GHS Pages (Secondary Pages).
-  - Plot PT1, PT2, and PT3 from the “GHS_FP_Main” page as well as BPG from the “D2430 Pumping Station” page on the same axis.+  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and PT3 (S800_GHS:CMG_D2708C:VP_RD) from the “GHS_FP_Main” page as well as BPG (RBT_BTS34:BPG_D2686:VP_RD) from the “D2686 Pumping Station” page on the same axis.
   - On the “FP_State_Buttons” page change from “Vent” mode to “Pump” mode by clicking **PUMP** in both the D2703 and D2708 tabs.   - On the “FP_State_Buttons” page change from “Vent” mode to “Pump” mode by clicking **PUMP** in both the D2703 and D2708 tabs.
   - Check the box next to “Valve Controls” on the “D2686 Pumping Station” page.   - Check the box next to “Valve Controls” on the “D2686 Pumping Station” page.
-  - If the TMP is off and Foreline Valve (FV) is closed, open the Roughing Valve (RV) briefly (2 seconds) by clicking **Open** and observe the behavior of the pressure gauges. If they all decrease at the same rate, again click **Open** to begin rouging out the chambers. +  - If the TMP is off and Foreline Valve (FV) is closed, open the Roughing Valve (RV) briefly (2 seconds) by clicking **Open** and observe the behavior of the pressure gauges. If they all decrease at the same rate, again click **Open** to begin roughing out the chambers. 
-  - If the TMP is still on (this could be the case for a short vent period), click **Close** on the FV to protect the pump before doing step 6. +  - If the TMP is still on (this could be the case for a short vent period), turn it off and close the foreline valve (FVbefore doing step 6. 
-  - When the BPG reads zero, **Close** RV and **Open** FV. Turn the TMP on if it is not already. When the TMP is “at speed” **Open** the TGV. If the TMP was off before opening the TGV, the chamber pressure may have risen to a point where the TGV closes automatically. If the BPG still reads < 1 Torrattempt to **Open** the TGV again.+  - When the BPG reads below 200 mTorr, **Close** RV and **Open** FV. Turn the TMP on if it is not already. When the TMP is “at speed” (~30,000 RPM), **Open** the TGV.  
 +  - NOTE: before TMP reaches "at speed"pressure in the chamber, as read by BPG, might increase to a point where TGV can not be open. If that is the caseturn off the turbo pump, close FV, and repeat steps 6, 7, 8 but this time, wait for BPG to read below 100 mTorr. Then try again step 8.
   - Allow the TMP to pump on the system until the IG reads < 1E-5 Torr.   - Allow the TMP to pump on the system until the IG reads < 1E-5 Torr.
   - On the “FP_State_Buttons” page click **RUN** to enter run mode.   - On the “FP_State_Buttons” page click **RUN** to enter run mode.
Line 49: Line 50:
 ===== Filling & Running FP Gaseous Detectors ===== ===== Filling & Running FP Gaseous Detectors =====
  
-  - Plot PT1, PT2, and the control valves for both D2703 (CRDC) and D2708 (IC).+  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and the control valves for both D2703 (CRDC, S800_GHS:CV_D2703:POS_RD_VLV) and D2708 (IC, S800_GHS:CV_D2708:POS_RD_VLV).
   - Click **Enable Controls** for the CRDC and IC “Control Valve PID”s, then click **ENABLE** to turn on PID controls for each vessel. Each control valve should adjust to its BASE value.   - Click **Enable Controls** for the CRDC and IC “Control Valve PID”s, then click **ENABLE** to turn on PID controls for each vessel. Each control valve should adjust to its BASE value.
   - If the CRDC valve remains completely open (stuck at 100%), open a probe with PV: “S800_GHS:CV_D2703:MODE_CSET_PVC”. In the “New Value” box, enter “CLOSE” and press enter. If the valve then closes (100% to 0%), enter “AUTO” in the “New Value” box and press enter. This should reenable PID control.   - If the CRDC valve remains completely open (stuck at 100%), open a probe with PV: “S800_GHS:CV_D2703:MODE_CSET_PVC”. In the “New Value” box, enter “CLOSE” and press enter. If the valve then closes (100% to 0%), enter “AUTO” in the “New Value” box and press enter. This should reenable PID control.
installation_fp_sci.txt · Last modified: 2023/08/18 10:19 by noji