This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
installation_fp_sci [2023/02/17 20:09] pereira [Venting FP Chamber] |
installation_fp_sci [2023/02/17 20:11] pereira [Pumpdown of FP Chamber] |
||
---|---|---|---|
Line 38: | Line 38: | ||
- Open “Focal Plane Pumping Station” page from FRIB EXP Main → S800 → Vacuum Main (Primary Pages). | - Open “Focal Plane Pumping Station” page from FRIB EXP Main → S800 → Vacuum Main (Primary Pages). | ||
- Open “GHS_FP_Main” and “FP_State_Buttons” pages from FRIB EXP Main → S800 → GHS Pages (Secondary Pages). | - Open “GHS_FP_Main” and “FP_State_Buttons” pages from FRIB EXP Main → S800 → GHS Pages (Secondary Pages). | ||
- | - Plot PT1, PT2, and PT3 from the “GHS_FP_Main” page as well as BPG from the “D2430 Pumping Station” page on the same axis. | + | - Plot PT1, PT2, and PT3 from the “GHS_FP_Main” page as well as BPG from the “D2686 Pumping Station” page on the same axis. |
- On the “FP_State_Buttons” page change from “Vent” mode to “Pump” mode by clicking **PUMP** in both the D2703 and D2708 tabs. | - On the “FP_State_Buttons” page change from “Vent” mode to “Pump” mode by clicking **PUMP** in both the D2703 and D2708 tabs. | ||
- Check the box next to “Valve Controls” on the “D2686 Pumping Station” page. | - Check the box next to “Valve Controls” on the “D2686 Pumping Station” page. | ||
- If the TMP is off and Foreline Valve (FV) is closed, open the Roughing Valve (RV) briefly (2 seconds) by clicking **Open** and observe the behavior of the pressure gauges. If they all decrease at the same rate, again click **Open** to begin rouging out the chambers. | - If the TMP is off and Foreline Valve (FV) is closed, open the Roughing Valve (RV) briefly (2 seconds) by clicking **Open** and observe the behavior of the pressure gauges. If they all decrease at the same rate, again click **Open** to begin rouging out the chambers. | ||
- | - If the TMP is still on (this could be the case for a short vent period), click **Close** | + | - If the TMP is still on (this could be the case for a short vent period), |
- When the BPG reads zero, **Close** RV and **Open** FV. Turn the TMP on if it is not already. When the TMP is “at speed” **Open** the TGV. If the TMP was off before opening the TGV, the chamber pressure may have risen to a point where the TGV closes automatically. If the BPG still reads < 1 Torr, attempt to **Open** the TGV again. | - When the BPG reads zero, **Close** RV and **Open** FV. Turn the TMP on if it is not already. When the TMP is “at speed” **Open** the TGV. If the TMP was off before opening the TGV, the chamber pressure may have risen to a point where the TGV closes automatically. If the BPG still reads < 1 Torr, attempt to **Open** the TGV again. | ||
- Allow the TMP to pump on the system until the IG reads < 1E-5 Torr. | - Allow the TMP to pump on the system until the IG reads < 1E-5 Torr. |