User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
installation_fp_sci [2023/03/07 08:27]
pereira [Venting FP Chamber]
installation_fp_sci [2023/03/07 08:34]
pereira [Pumpdown of FP Chamber]
Line 25: Line 25:
   - Once the FPG bottoms out, check the box next to “Valve Controls”, then click **Close** next to the Turbo Gate Valve (TGV).    - Once the FPG bottoms out, check the box next to “Valve Controls”, then click **Close** next to the Turbo Gate Valve (TGV). 
   - If the system will only be vented for a short time, leave the TMP on, otherwise turn it off.   - If the system will only be vented for a short time, leave the TMP on, otherwise turn it off.
-  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and PT3 (S800_GHS:CMG_D2708C:VP_RD) from the “GHS_FP_Main” page as well as BPG from the “D2686 Pumping Station” page on the same axis.+  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and PT3 (S800_GHS:CMG_D2708C:VP_RD) from the “GHS_FP_Main” page as well as BPG (RBT_BTS34:BPG_D2686:VP_RD) from the “D2686 Pumping Station” page on the same axis.
   - Briefly (~2 seconds) open the vent valve by clicking **Open** next to the valve labeled “Vent” then click **Close**. Check that all the pressures are increasing at the same rate.   - Briefly (~2 seconds) open the vent valve by clicking **Open** next to the valve labeled “Vent” then click **Close**. Check that all the pressures are increasing at the same rate.
   - Again, open the vent valve and observe the pressure for 30 seconds to ensure the pressures are increasing at the same rate among all four gauges. If a difference of > 1 Torr is observed between any two gauges, click **Close** on the vent valve.   - Again, open the vent valve and observe the pressure for 30 seconds to ensure the pressures are increasing at the same rate among all four gauges. If a difference of > 1 Torr is observed between any two gauges, click **Close** on the vent valve.
Line 38: Line 38:
   - Open “Focal Plane Pumping Station” page from FRIB EXP Main → S800 → Vacuum Main (Primary Pages).   - Open “Focal Plane Pumping Station” page from FRIB EXP Main → S800 → Vacuum Main (Primary Pages).
   - Open “GHS_FP_Main” and “FP_State_Buttons” pages from FRIB EXP Main → S800 → GHS Pages (Secondary Pages).   - Open “GHS_FP_Main” and “FP_State_Buttons” pages from FRIB EXP Main → S800 → GHS Pages (Secondary Pages).
-  - Plot PT1, PT2, and PT3 from the “GHS_FP_Main” page as well as BPG from the “D2686 Pumping Station” page on the same axis.+  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and PT3 (S800_GHS:CMG_D2708C:VP_RD) from the “GHS_FP_Main” page as well as BPG (RBT_BTS34:BPG_D2686:VP_RD) from the “D2686 Pumping Station” page on the same axis.
   - On the “FP_State_Buttons” page change from “Vent” mode to “Pump” mode by clicking **PUMP** in both the D2703 and D2708 tabs.   - On the “FP_State_Buttons” page change from “Vent” mode to “Pump” mode by clicking **PUMP** in both the D2703 and D2708 tabs.
   - Check the box next to “Valve Controls” on the “D2686 Pumping Station” page.   - Check the box next to “Valve Controls” on the “D2686 Pumping Station” page.
installation_fp_sci.txt · Last modified: 2023/08/18 10:19 by noji