User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
installation_fp_sci [2023/07/12 08:43]
noji
installation_fp_sci [2023/08/17 12:39]
pereira [Emptying Detectors]
Line 21: Line 21:
   - The IC vessel has a much larger quantity of gas compared to the CRDC vessel. In order to pump them out at a similar speed go to the “FP_State_Buttons” page and go to the D2708 (Ion Chamber) tab. Click **EMPTY**. This will more rapidly pump down the IC vessel. Both vessels should be emptied at about the same time.   - The IC vessel has a much larger quantity of gas compared to the CRDC vessel. In order to pump them out at a similar speed go to the “FP_State_Buttons” page and go to the D2708 (Ion Chamber) tab. Click **EMPTY**. This will more rapidly pump down the IC vessel. Both vessels should be emptied at about the same time.
   - Open a data browser and plot the PVs for PT1 (S800_GHS:CMG_D2708A:VP_RD) and PT2 (S800_GHS:CMG_D2703A:VP_RD).    - Open a data browser and plot the PVs for PT1 (S800_GHS:CMG_D2708A:VP_RD) and PT2 (S800_GHS:CMG_D2703A:VP_RD). 
-  - Wait for PT1 and PT2 to read < Torr. This should take about 30 minutes.+  - Wait for PT1 and PT2 to read < 0.5 Torr. This should take about 30 minutes.
   - Open the Focal Plane VAC D2686 page (FRIB EXP Main → S800 → Vacuum Main → Focal Plane).   - Open the Focal Plane VAC D2686 page (FRIB EXP Main → S800 → Vacuum Main → Focal Plane).
   - Ensure the beamline gate valve to the FP chamber is closed (BGV_D2671).   - Ensure the beamline gate valve to the FP chamber is closed (BGV_D2671).
Line 32: Line 32:
  
 ===== Venting FP Chamber ===== ===== Venting FP Chamber =====
 +
 +Notify the Control Room that you will vent the FP chamber.
 +
   - Ensure the IG in the Focal Plane Pumping Station is off. This page can be found in FRIB EXP Main → S800 → Vacuum Main (Primary Pages) → Focal Plane.   - Ensure the IG in the Focal Plane Pumping Station is off. This page can be found in FRIB EXP Main → S800 → Vacuum Main (Primary Pages) → Focal Plane.
   - Check the box next to “Valve Controls”, then click **Close** next to the Turbo Gate Valve (TGV).   - Check the box next to “Valve Controls”, then click **Close** next to the Turbo Gate Valve (TGV).
installation_fp_sci.txt · Last modified: 2023/08/18 10:19 by noji