User Tools

Site Tools


preparation_for_tuning_the_s800

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Next revision Both sides next revision
preparation_for_tuning_the_s800 [2013/12/13 19:29]
pereira created
preparation_for_tuning_the_s800 [2013/12/13 20:28]
pereira
Line 1: Line 1:
 ====== Preparation for tuning ====== ====== Preparation for tuning ======
-  * [[Software]] +  * [[Software|Software overview]] 
-  * [[Electronics]]+  * [[Electronics overview]]
   * [[Gas handling system]]   * [[Gas handling system]]
   * [[HV bias]]   * [[HV bias]]
Line 7: Line 7:
   * [[Turning magnets on/off]]   * [[Turning magnets on/off]]
   * [[Magnetic-rigidity setting]]   * [[Magnetic-rigidity setting]]
- 
-ELECTRONICS, PATCH PANELS, AND HARDWARE 
-data-U6 (south end) 
- Electronic location: two racks that contain all the electronics and patch panels.   
- Oscilloscope TEKSCOPE11 
- Use:  S800 detector/timing diagnostics 
- Location:  left rack on shelf below I3 beamstop control 
- NMR Oscilloscopes 
- Use: NMR resonances display 
- Location: upper two shelves on right electronics rack 
- NIM bin  
- Location: below NMR scopes in right electronics racks 
- Use: Canberra HV supply for Object scintillator 
- Upper patch panels (top of left rack) 
- Cables 1-10:  to object  (not connected in vault; maybe these go to an old target location in the transfer hall) 
- Cables 11-20:  to object 
- Cables 21-25:  to intermediate image box 
- Cable 26 is missing 
- Cable 27-50 should go to pivot point (mostly not connect in vault) 
- Middle patch panel (top of left rack) 
- Cables 51-70:  to S800 FP 
- SHV cables 1-2:  to object 
- SHV cables 6-10:  should go to intermediate image box (apparently not connected in vault) 
- SHV cables 11-20:  to pivot point (not connected in vault) 
- 
-S800 FP (top level of S3 vault) 
- Electronics location:  two racks “East” and “West” facing each other on top level of S3 vault on south side of FP 
- Patch panels: 
- SHV Cables 21-30:  to Data-U6 dangling at location of old S800 FP electronics under FP 
- Cables 51-70:  to Data-U6 
- Cables 91-110:  to pivot point 
- 
-Pivot point (bottom level of S3 vault) 
- Electronics location:  one rack on bottom level of S3 vault on south side of final analysis line triplet near stairs to middle level 
- Patch panels 
- Cables 75-110:  to Data-U6 
- Cables 70-80:  to object  
- Cables 81-90:  to intermediate image 
- Cables 91-110:  to S800 FP 
- 
-Intermediate Image (accessed via middle level of S3 vault) 
- Electronics location:  one rack above intermediate image box located on west end of top level of S3 vault 
- Patch panels (in electronics rack on top level of S3 vault) 
- Cables 21-25:  to Data-U6 
- Cables 81-90:  to pivot point 
- 
-Object position (access via middle level of S3 vault) 
- Electronics location:  under first triplet in analysis line 
- Patch panels (mounted on object box support under object box) 
- Cables 11-20:  to Data-U6 
- Cables 71-80:  to pivot point 
- SHV cables 1-2:  to Data-U6 
- 
- 
- 
- 
- 
- 
- 
- 
  
  
preparation_for_tuning_the_s800.txt · Last modified: 2015/10/27 09:32 by pereira