User Tools

Site Tools


preparation_for_tuning_the_s800

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
preparation_for_tuning_the_s800 [2013/12/13 20:25]
pereira
preparation_for_tuning_the_s800 [2013/12/13 20:28]
pereira
Line 1: Line 1:
 ====== Preparation for tuning ====== ====== Preparation for tuning ======
-  * [[Software overview]]+  * [[Software|Software overview]]
   * [[Electronics overview]]   * [[Electronics overview]]
   * [[Gas handling system]]   * [[Gas handling system]]
Line 7: Line 7:
   * [[Turning magnets on/off]]   * [[Turning magnets on/off]]
   * [[Magnetic-rigidity setting]]   * [[Magnetic-rigidity setting]]
- 
-ELECTRONICS, PATCH PANELS, AND HARDWARE 
-data-U6 (south end) 
- Electronic location: two racks that contain all the electronics and patch panels.   
- Oscilloscope TEKSCOPE11 
- Use:  S800 detector/timing diagnostics 
- Location:  left rack on shelf below I3 beamstop control 
- NMR Oscilloscopes 
- Use: NMR resonances display 
- Location: upper two shelves on right electronics rack 
- NIM bin  
- Location: below NMR scopes in right electronics racks 
- Use: Canberra HV supply for Object scintillator 
- Upper patch panels (top of left rack) 
- Cables 1-10:  to object  (not connected in vault; maybe these go to an old target location in the transfer hall) 
- Cables 11-20:  to object 
- Cables 21-25:  to intermediate image box 
- Cable 26 is missing 
- Cable 27-50 should go to pivot point (mostly not connect in vault) 
- Middle patch panel (top of left rack) 
- Cables 51-70:  to S800 FP 
- SHV cables 1-2:  to object 
- SHV cables 6-10:  should go to intermediate image box (apparently not connected in vault) 
- SHV cables 11-20:  to pivot point (not connected in vault) 
- 
-S800 FP (top level of S3 vault) 
- Electronics location:  two racks “East” and “West” facing each other on top level of S3 vault on south side of FP 
- Patch panels: 
- SHV Cables 21-30:  to Data-U6 dangling at location of old S800 FP electronics under FP 
- Cables 51-70:  to Data-U6 
- Cables 91-110:  to pivot point 
- 
-Pivot point (bottom level of S3 vault) 
- Electronics location:  one rack on bottom level of S3 vault on south side of final analysis line triplet near stairs to middle level 
- Patch panels 
- Cables 75-110:  to Data-U6 
- Cables 70-80:  to object  
- Cables 81-90:  to intermediate image 
- Cables 91-110:  to S800 FP 
- 
-Intermediate Image (accessed via middle level of S3 vault) 
- Electronics location:  one rack above intermediate image box located on west end of top level of S3 vault 
- Patch panels (in electronics rack on top level of S3 vault) 
- Cables 21-25:  to Data-U6 
- Cables 81-90:  to pivot point 
- 
-Object position (access via middle level of S3 vault) 
- Electronics location:  under first triplet in analysis line 
- Patch panels (mounted on object box support under object box) 
- Cables 11-20:  to Data-U6 
- Cables 71-80:  to pivot point 
- SHV cables 1-2:  to Data-U6 
- 
- 
- 
- 
- 
- 
- 
- 
  
  
preparation_for_tuning_the_s800.txt · Last modified: 2015/10/27 09:32 by pereira