Differences
This shows you the differences between two versions of the page.
Both sides previous revision
Previous revision
|
Next revision
Both sides next revision
|
s800_daq_tools [2015/10/26 15:46] pereira |
s800_daq_tools [2015/10/26 16:59] pereira [Delay Window] |
| |
The EventBuilder window will appear as part of starting the [[s800 daq tools#run control window|Run Control]]. This window will communicate statistics such as number of buffers read and number of events broadcast, and will also show error messages, should they occur. | The EventBuilder window will appear as part of starting the [[s800 daq tools#run control window|Run Control]]. This window will communicate statistics such as number of buffers read and number of events broadcast, and will also show error messages, should they occur. |
| |
| |
| ==== Mesytec CFD GUI ==== |
| |
| The Mesytec CFD (MCFD) GUI is invoked by either clicking the icon **MCFD GUI** in the desktop of [[Software#u6pc5 (data U6)|u6pc5]] or by navigating in a Linux terminal and typing ''$DAQBIN/MCFDControl16 --protocol usb --serialfile /dev/ttyUSB0''. The environment variable DAQBIN is defined by sourcing the **daqsetup.bash** file in directory **/usr/opt/nscldaq/xxxx/bin**, where xxxx is the nscldaq version number (11.0-015 on Oct 26, 2015). |
| |
| |
| {{:wiki:482px-Runcontrol.png|Run Control Window}} |
| |
| |
| |
| |
| |
==== Delay Window ==== | ==== Delay Window ==== |
| |
{{:wiki:Delay-Window.png|Delay Window}} | {{:wiki:mcfd16gui.jpg|MCFD GUI}} |
| |
This window appears when the "Init" button is pressed on the VME crate controller tab as part of the initial setup of the [[s800 daq tools#run control window|S800 USB daq]]. It can also be accessed by pressing the "Show GUIs" button. The delay module allows software configurable delays to be applied to each of the signals indicated in the Channel column, which then form the TDC stops. It is configurable to enable delays to be set with beam on target, as the needed delay may change depending on experimental conditions. | This window appears when the "Init" button is pressed on the VME crate controller tab as part of the initial setup of the [[s800 daq tools#run control window|S800 USB daq]]. It can also be accessed by pressing the "Show GUIs" button. The delay module allows software configurable delays to be applied to each of the signals indicated in the Channel column, which then form the TDC stops. It is configurable to enable delays to be set with beam on target, as the needed delay may change depending on experimental conditions. |