This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
s800_daq_tools [2017/04/08 13:24] pereira [Mesytec CFD GUI] |
s800_daq_tools [2017/04/08 13:25] pereira [Delay Window] |
||
---|---|---|---|
Line 65: | Line 65: | ||
- | This window appears when the "Init" button is pressed on the VME crate controller tab as part of the initial setup of the [[s800 daq tools#run control window|S800 USB daq]]. It can also be accessed by pressing the "Show GUIs" button. The delay module allows software configurable delays to be applied to each of the signals indicated in the Channel column, which then form the TDC stops. It is configurable to enable delays to be set with beam on target, as the needed delay may change depending on experimental conditions. | + | This window appears when the "Launch Gate Delay GUI" button is pressed on the ReadoutGUI |
Some important things to remember: | Some important things to remember: |