User Tools

Site Tools


to-do_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
to-do_list [2017/04/06 10:48]
pereira [In data U6]
to-do_list [2017/06/16 19:08]
pereira [In data U6]
Line 27: Line 27:
  
   * Verify that **stagearea** in u6pc5 is pointing to the right place. After typing ''ls -l ~/stagearea'' in a u6pc5 terminal, you should see: **/user/s800/stagearea -> /mnt/daqtesting/s800/exxxxx**, where xxxxx corresponds to the experiment number. If the experiment number is not right, run script **goinstall** from any directory, and follow the intructions. After that, verify that the stagearea is correct.   * Verify that **stagearea** in u6pc5 is pointing to the right place. After typing ''ls -l ~/stagearea'' in a u6pc5 terminal, you should see: **/user/s800/stagearea -> /mnt/daqtesting/s800/exxxxx**, where xxxxx corresponds to the experiment number. If the experiment number is not right, run script **goinstall** from any directory, and follow the intructions. After that, verify that the stagearea is correct.
 +
 +  * Set S800 DAQ in [[s800 daq tools#Running in Slave mode with multilogger |Slave mode and enable multilogger]] to record S800 data in the s800 stagearea.
    
   * Check [[s800 daq tools#scaler display|scalers]] while running S800 DAQ   * Check [[s800 daq tools#scaler display|scalers]] while running S800 DAQ
- 
  
   * [[Turning magnets on/off#Set magnet currents individually |Put 10 Amps in Spectrograph dipoles]]   * [[Turning magnets on/off#Set magnet currents individually |Put 10 Amps in Spectrograph dipoles]]
to-do_list.txt ยท Last modified: 2023/10/19 17:15 by swartzj