This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
tuning_the_s800_xdt [2017/06/17 15:10] pereira [Coincidences] |
tuning_the_s800_xdt [2017/06/17 15:12] pereira [Coincidences] |
||
---|---|---|---|
Line 374: | Line 374: | ||
* Setup | * Setup | ||
- | * Using the [[S800 DAQ tools# | + | * Using the [[S800 DAQ tools# |
* Assign each wire to an inspect channel from the patch panel so that you can check their timings in the oscilloscope | * Assign each wire to an inspect channel from the patch panel so that you can check their timings in the oscilloscope | ||
* Adjust the width of the early signal (S800 or secondary) should be wide enough to catch coincidences with the late signal (width of late signal is not critical) | * Adjust the width of the early signal (S800 or secondary) should be wide enough to catch coincidences with the late signal (width of late signal is not critical) | ||
Line 384: | Line 384: | ||
* This check is required for verification in cases of low beam intensity (e.g. 1000 pps) | * This check is required for verification in cases of low beam intensity (e.g. 1000 pps) | ||
* Length of run required is typically about 10-15 minutes | * Length of run required is typically about 10-15 minutes | ||
- | * To be resolved: | + | |