This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
vacuum_control [2016/11/09 14:57] pereira [Target Chamber] |
vacuum_control [2016/11/09 15:00] pereira [Venting analysis-line lower-dipole section] |
||
---|---|---|---|
Line 51: | Line 51: | ||
- Verify that the target area is vented. | - Verify that the target area is vented. | ||
- | - Ensure | + | - Using the EMIS controllers in the middle level of the S3 vault (see figure above), ensure |
- Ensure that gate valves I246GV (between lower-dipole section and target area) and I215GV (between intermediate image area and the lower-dipole section) are closed. | - Ensure that gate valves I246GV (between lower-dipole section and target area) and I215GV (between intermediate image area and the lower-dipole section) are closed. | ||
- Open S800vac with PanelMate. | - Open S800vac with PanelMate. |