This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2017/06/12 14:50] pereira [Vent focal-plane chamber] |
venting_pumping_intermediate_image_box [2017/06/12 14:51] pereira [Vent focal-plane chamber] |
||
---|---|---|---|
Line 19: | Line 19: | ||
* [[Vacuum control|Turn off]] ion gauge **I213IG** | * [[Vacuum control|Turn off]] ion gauge **I213IG** | ||
* Open **S800Vac** and go to page 03 (" | * Open **S800Vac** and go to page 03 (" | ||
- | * Check box " | + | * Check box " |
+ | {{: | ||
+ | * In order to begin venting process, select that box and click "BEGIN VENTING PROCEDURE" | ||
* Box "VENT STATUS" | * Box "VENT STATUS" | ||
* Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{: | * Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{: |