venting_pumping_intermediate_image_box [2017/06/12 14:52] pereira [Vent focal-plane chamber] |
venting_pumping_intermediate_image_box [2024/01/11 10:09] noji [Venting the Chamber] |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ===== Venting/ | + | ====== Venting/ |
- | The procedures to vent/pump the S800 Intermediate Image box, and/or filling the PPAC detectors with gas must be done carefully to ensure that the PPACs are not damaged. For instance, before venting the chamber, we have to make sure that the PPACs are empty and equalized with respect to the vacuum in the chamber. In order to avoid errors, an automated gas handling system (II-GHS) was designed to perform these tasks safety. The system is schematically illustrated in the figure below. It shows the status | + | * [[#General information]] |
+ | * [[#Emptying Detectors]] | ||
+ | * [[#Filling and Running Detectors]] | ||
+ | * [[# | ||
+ | ===== General information | ||
+ | The procedures to vent/pump the S800 Intermediate Image box, and/or filling the PPAC detectors with gas must be done carefully to ensure that the PPACs are not damaged. For instance, before venting the chamber, we have to make sure that the PPACs are empty and equalized with respect to the vacuum in the chamber. In order to avoid errors, an automated gas handling system (II-GHS) was designed to perform these tasks safely. The II-GHS equipment (valves, flow-meter, pipes, isobutane gas bottle. etc.) are located on the west balcony | ||
- | {{:wiki:ghsiippacs.png?1000|Gas Handling System of S800 Intermediate Image}} | + | {{:wiki:IIGHShardware.jpeg|Gas Handling System of S800 Intermediate Image}} |
- | The II-GHS equipment (valves, flow-meter, pipes, etc.) are located | + | The GHS is operated remotely through CS studio. Its page can be found on the EXP network through FRIB EXP Main → S800 → GHS Pages (Secondary Pages) → Intermediate Image PPAC and is shown below. |
- | {{:wiki:IIGHShardware.jpg?600|Gas Handling System of S800 Intermediate Image}} | + | {{:wiki:ii-ppac-ghs-css.png|}} |
- | ==== Vent focal-plane chamber ==== | + | |
- | Requirements: | + | |
- | * Verify that PPACs are in automatic mode with gas removed (**S3_Gas_Handling**) | + | The layout |
- | * | + | |
- | * If gas is removed but the system is not in the automatic mode, consult the Beam Physicists or Device Physicist. NOTE: the only valves that should be open in **S3_Gas_Handling** are the "Det Bypass" | + | |
- | * Verify that PPACs are not biased: | + | |
- | * Check that the detectors are unbiased by opening the [[HV bias|HV GUI]] | + | |
- | * Notify the system | + | |
- | * Isolate chamber by closing gate valves **I212GV** and **I215GV** | + | |
- | * [[Vacuum control|Turn off]] ion gauge **I213IG** | + | |
- | * Open **S800Vac** and go to page 03 (" | + | |
- | * Check box " | + | |
- | {{: | + | |
- | * In order to begin venting process, select that box and click "BEGIN VENTING PROCEDURE" | + | |
- | * Box "VENT STATUS" | + | |
- | * Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{: | + | |
- | * When pressure in **I215PG** reaches atmospheric pressure, stop the venting process by selecting the box "VENT STATUS" | + | |
- | * The status in the box "VENT STATUS" | + | {{: |
- | * You can now open the chamber | + | |
+ | The operational states of the II-GHS are shown in the diagram below. | ||
+ | |||
+ | {{: | ||
+ | |||
+ | ===== Emptying Detectors ===== | ||
+ | - Set “PPAC Setpoint” to 0 Torr. | ||
+ | - Click **EMPTY** on the “GHS_II-PPAC_Main” page to begin pumping out the gas quickly. | ||
+ | - When “PPAC Pressure” reads < 0.1 Torr, click **MAN** and then **AUTO**. This will release the remaining gas into the diagnostics box. | ||
+ | - Monitor D2340 pumping station and ensure the TMP stays on and TGV remains open. If not, contact the Vacuum Operation group. | ||
+ | - Valves #1-5 should be closed and valve #6 should remain open. From this state click PUMP to enter pump mode and leave the system in this state until it is ready to be filled. | ||
+ | * Jorge noted on 2/12/2023 that this step did not work; he reported that when he clicked **PUMP** nothing happened. Instead, he had to “manually” enter the PV name associated with this command and changed from 0 to 1. He speculated that this was most likely due to a CS Studio problem. | ||
+ | |||
+ | ===== Venting the Chamber ===== | ||
+ | |||
+ | From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure | ||
+ | * that the gate valves **D2426 BGV** and **D2436 BGV** are closed, and that the IG is off, and | ||
+ | * that the turbo pump gate valve TVG is closed. | ||
+ | |||
+ | To vent the chamber: | ||
+ | - Monitor **RBT_BTS32: | ||
+ | - close **RV**, the valve to the roughing pump, and | ||
+ | - open **Vent**. | ||
+ | |||
+ | The PPAC pressure S800_GHS: | ||
+ | RBT_BTS32: | ||
+ | ===== Evacuating the Chamber ===== | ||
+ | |||
+ | {{: | ||
+ | ===== Filling and Running Detectors ===== | ||
+ | - If in Vent Mode, click **PUMP** then click **RUN** to enter Run Mode. | ||
+ | - If in Pump Mode, click **RUN** to enter Run Mode. | ||
+ | - Plot and monitor IG_D2430: | ||
+ | - Step up “PPAC Setpoint” by 1 Torr from 0 to 6 Torr. Allow the “PPAC Pressure” to stabilize for 15 seconds at each step. This should be a quick process but **DO NOT** simply set the “PPAC Setpoint” to 6 Torr as the gas flow could overwhelm the system. | ||
+ | - PPAC pressure should stabilize after ~1 min. HV may now be turned on to operate the PPACs. | ||
+ | |||
+ | ===== Troubleshooting ===== | ||
+ | - If any issues are encountered during filling, running, or emptying, contact the Vacuum Operation group for assistance. |