User Tools

Site Tools


venting_pumping_intermediate_image_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
venting_pumping_intermediate_image_box [2018/04/16 16:13]
pereira
venting_pumping_intermediate_image_box [2018/04/20 11:24]
pereira [Vent Intermediate-image chamber]
Line 28: Line 28:
   * Check box "PUMPDOWN STATUS INTERMEDIATE IMAGE BOX". It should read "Good vacuum"    * Check box "PUMPDOWN STATUS INTERMEDIATE IMAGE BOX". It should read "Good vacuum" 
 {{:wiki:iis800vac_pumped.jpg?500|S800vac Panel Mate}}.  {{:wiki:iis800vac_pumped.jpg?500|S800vac Panel Mate}}. 
-  * In order to begin venting process, select that box and click "BEGIN VENTING PROCEDURE"+  * In order to begin venting process, select box "VENT STATUS" and click "BEGIN VENTING PROCEDURE"
         * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER"         * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER"
         * Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{:wiki:iis800vac_startventing.jpg?500|S800vac Panel Mate: start venting}}.          * Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{:wiki:iis800vac_startventing.jpg?500|S800vac Panel Mate: start venting}}. 
venting_pumping_intermediate_image_box.txt ยท Last modified: 2024/01/12 09:37 by noji