User Tools

Site Tools


venting_pumping_intermediate_image_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
venting_pumping_intermediate_image_box [2018/04/16 16:13]
pereira
venting_pumping_intermediate_image_box [2018/04/25 17:03]
pereira [Pumping Intermediate-image chamber]
Line 28: Line 28:
   * Check box "PUMPDOWN STATUS INTERMEDIATE IMAGE BOX". It should read "Good vacuum"    * Check box "PUMPDOWN STATUS INTERMEDIATE IMAGE BOX". It should read "Good vacuum" 
 {{:wiki:iis800vac_pumped.jpg?500|S800vac Panel Mate}}.  {{:wiki:iis800vac_pumped.jpg?500|S800vac Panel Mate}}. 
-  * In order to begin venting process, select that box and click "BEGIN VENTING PROCEDURE"+  * In order to begin venting process, select box "VENT STATUS" and click "BEGIN VENTING PROCEDURE"
         * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER"         * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER"
         * Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{:wiki:iis800vac_startventing.jpg?500|S800vac Panel Mate: start venting}}.          * Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{:wiki:iis800vac_startventing.jpg?500|S800vac Panel Mate: start venting}}. 
Line 41: Line 41:
   * Verify that Chamber is closed and pressure-relief valve (north side of the chamber) is properly closed (NOTE: sometimes, due to overpressure from dry N2 during the venting procedure, the O-ring in pressure-relief valve flange is moved out of place)   * Verify that Chamber is closed and pressure-relief valve (north side of the chamber) is properly closed (NOTE: sometimes, due to overpressure from dry N2 during the venting procedure, the O-ring in pressure-relief valve flange is moved out of place)
   * Verify that PPACs are not biased by opening the [[HV bias|HV GUI]]   * Verify that PPACs are not biased by opening the [[HV bias|HV GUI]]
-  * IMPORTANT: Close manual roughing pump valve located near the intermediate-image chamber {{:wiki:manualvalverough.jpg?350|Manual valve rough pump}}. +  * IMPORTANT: Verify that manual roughing pump valve located near the intermediate-image chamber is closed{{:wiki:manualvalverough.jpg?350|Manual valve rough pump}}. 
  
   * Insert PPACs/turn on light (Diagnostic Drives PanelMate) and verify condition through sight window on south side of the chamber (be careful no to bump the bullet camera).   * Insert PPACs/turn on light (Diagnostic Drives PanelMate) and verify condition through sight window on south side of the chamber (be careful no to bump the bullet camera).
venting_pumping_intermediate_image_box.txt ยท Last modified: 2024/01/12 09:37 by noji