This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2018/08/14 10:52] pereira [Pumping Intermediate-image chamber] |
venting_pumping_intermediate_image_box [2018/12/18 11:18] pereira [Vent Intermediate-image chamber] |
||
---|---|---|---|
Line 23: | Line 23: | ||
* Check that the detectors are unbiased by opening the [[HV bias|HV GUI]] | * Check that the detectors are unbiased by opening the [[HV bias|HV GUI]] | ||
* Notify the system of the bias-off state by selecting the " | * Notify the system of the bias-off state by selecting the " | ||
+ | * Open **S800Vac** and go to page 03 (" | ||
* Isolate chamber by closing gate valves **I212GV** and **I215GV** | * Isolate chamber by closing gate valves **I212GV** and **I215GV** | ||
* [[Vacuum control|Turn off]] ion gauge **I213IG** | * [[Vacuum control|Turn off]] ion gauge **I213IG** | ||
- | * Open **S800Vac** and go to page 03 (" | ||
* Check box " | * Check box " | ||
{{: | {{: |