User Tools

Site Tools


venting_pumping_intermediate_image_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
venting_pumping_intermediate_image_box [2018/08/14 10:52]
pereira [Pumping Intermediate-image chamber]
venting_pumping_intermediate_image_box [2018/12/19 11:01]
pereira [Venting/pumping Intermediate Image box and filling PPACs with gas]
Line 1: Line 1:
 ====== Venting/pumping Intermediate Image box and filling PPACs with gas ====== ====== Venting/pumping Intermediate Image box and filling PPACs with gas ======
 +
 +
 +
 +
 +
 +===== General information =====
 The procedures to vent/pump the S800 Intermediate Image box, and/or filling the PPAC detectors with gas must be done carefully to ensure that the PPACs are not damaged. For instance, before venting the chamber, we have to make sure that the PPACs are empty and equalized with respect to the vacuum in the chamber. In order to avoid errors, an automated gas handling system (II-GHS) was designed to perform these tasks safely. The system is schematically illustrated in the figure below. It shows the status of the valves (red: closed, white: open) when the intermediate image chamber is under vacuum and the PPACs are filled with gas (NOTE: This figure was taken from the A1900 GHS included in Barney. A similar GUI for the S800 II PPACs is not yet available): The procedures to vent/pump the S800 Intermediate Image box, and/or filling the PPAC detectors with gas must be done carefully to ensure that the PPACs are not damaged. For instance, before venting the chamber, we have to make sure that the PPACs are empty and equalized with respect to the vacuum in the chamber. In order to avoid errors, an automated gas handling system (II-GHS) was designed to perform these tasks safely. The system is schematically illustrated in the figure below. It shows the status of the valves (red: closed, white: open) when the intermediate image chamber is under vacuum and the PPACs are filled with gas (NOTE: This figure was taken from the A1900 GHS included in Barney. A similar GUI for the S800 II PPACs is not yet available):
  
Line 23: Line 29:
         * Check that the detectors are unbiased by opening the [[HV bias|HV GUI]]         * Check that the detectors are unbiased by opening the [[HV bias|HV GUI]]
         * Notify the system of the bias-off state by selecting the "I214BON_CONFIRM" box in **S3_Gas_Handling** and clicking "PP BIAS OFF CONFIRMED"         * Notify the system of the bias-off state by selecting the "I214BON_CONFIRM" box in **S3_Gas_Handling** and clicking "PP BIAS OFF CONFIRMED"
 +  * Open **S800Vac** and go to page 03 ("Intermediate image box vacuum system sec 15")
   * Isolate chamber by closing gate valves **I212GV** and **I215GV**   * Isolate chamber by closing gate valves **I212GV** and **I215GV**
   * [[Vacuum control|Turn off]] ion gauge **I213IG**    * [[Vacuum control|Turn off]] ion gauge **I213IG** 
-  * Open **S800Vac** and go to page 03 ("Intermediate image box vacuum system sec 15") 
   * Check box "PUMPDOWN STATUS INTERMEDIATE IMAGE BOX". It should read "Good vacuum"    * Check box "PUMPDOWN STATUS INTERMEDIATE IMAGE BOX". It should read "Good vacuum" 
 {{:wiki:iis800vac_pumped.jpg?500|S800vac Panel Mate}}.  {{:wiki:iis800vac_pumped.jpg?500|S800vac Panel Mate}}. 