This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2018/12/19 11:03] pereira [Venting/pumping Intermediate Image box and filling PPACs with gas] |
venting_pumping_intermediate_image_box [2018/12/19 11:07] pereira [Pumping Intermediate-image chamber] |
||
---|---|---|---|
Line 3: | Line 3: | ||
* [[#Vent Intermediate-image chamber|Venting Intermediate-image chamber]] | * [[#Vent Intermediate-image chamber|Venting Intermediate-image chamber]] | ||
* [[#Pumping Intermediate-image chamber]] | * [[#Pumping Intermediate-image chamber]] | ||
+ | * [[#Filling Intermediate-image delay PPAC]] | ||
===== General information ===== | ===== General information ===== | ||
Line 68: | Line 69: | ||
* (Note: sometimes it is necessary to repeat this operation a couple of times). | * (Note: sometimes it is necessary to repeat this operation a couple of times). | ||
* At the end of the procedure, close the manual roughing pump valve | * At the end of the procedure, close the manual roughing pump valve | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== Filling Intermediate-image delay PPAC ===== | ||
+ | |||