This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2018/12/19 11:07] pereira [Venting/pumping Intermediate Image box and filling PPACs with gas] |
venting_pumping_intermediate_image_box [2018/12/19 11:07] pereira [Pumping Intermediate-image chamber] |
||
---|---|---|---|
Line 69: | Line 69: | ||
* (Note: sometimes it is necessary to repeat this operation a couple of times). | * (Note: sometimes it is necessary to repeat this operation a couple of times). | ||
* At the end of the procedure, close the manual roughing pump valve | * At the end of the procedure, close the manual roughing pump valve | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== Filling Intermediate-image delay PPAC ===== | ||
+ | |||