This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2024/01/11 09:53] noji [General information] |
venting_pumping_intermediate_image_box [2024/01/11 10:12] noji [Venting the Chamber] |
||
---|---|---|---|
Line 31: | Line 31: | ||
===== Venting the Chamber ===== | ===== Venting the Chamber ===== | ||
+ | From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure | ||
+ | * that the PPACs have been unbiased, | ||
+ | * that the gate valves **D2426 BGV** and **D2436 BGV** are closed, and that the IG is off, and | ||
+ | * that the turbo pump gate valve TVG is closed. | ||
+ | |||
+ | To vent the chamber: | ||
+ | - Monitor **RBT_BTS32: | ||
+ | - close **RV**, the valve to the roughing pump, and | ||
+ | - open **Vent**. | ||
+ | |||
+ | The PPAC pressure S800_GHS: | ||
+ | RBT_BTS32: | ||
===== Evacuating the Chamber ===== | ===== Evacuating the Chamber ===== | ||
+ | |||
+ | {{: | ||
===== Filling and Running Detectors ===== | ===== Filling and Running Detectors ===== | ||
- If in Vent Mode, click **PUMP** then click **RUN** to enter Run Mode. | - If in Vent Mode, click **PUMP** then click **RUN** to enter Run Mode. |