venting_pumping_intermediate_image_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
venting_pumping_intermediate_image_box [2024/01/11 09:54]
noji [Evacuating the Chamber]
venting_pumping_intermediate_image_box [2024/01/11 10:37]
noji [Venting the Chamber]
Line 23: Line 23:
 ===== Emptying Detectors ===== ===== Emptying Detectors =====
   - Set “PPAC Setpoint” to 0 Torr.   - Set “PPAC Setpoint” to 0 Torr.
-  - Click **EMPTY** on the “GHS_II-PPAC_Main” page to begin pumping out the gas quickly. +  - Click **EMPTY** on the “GHS_II-PPAC_Main” page to open valves #3 and #4 which will allow for pumping out the gas quickly. 
-  - When “PPAC Pressure” reads < 0.1 Torr, click **MAN** and then **AUTO**. This will release the remaining gas into the diagnostics box.+  - When “PPAC Pressure” reads < 0.1 Torr, turn off IG and click **MAN** and then **AUTO**. This will open valve #6 to release the remaining gas into the diagnostics box.
   - Monitor D2340 pumping station and ensure the TMP stays on and TGV remains open. If not, contact the Vacuum Operation group.   - Monitor D2340 pumping station and ensure the TMP stays on and TGV remains open. If not, contact the Vacuum Operation group.
-  - Valves #1-5 should be closed and valve #6 should remain open. From this state click PUMP to enter pump mode and leave the system in this state until it is ready to be filled. +  - Valves #1-5 should be closed and valve #6 should remain open. From this state click **VENT** and then **PUMP** to enter pump mode and leave the system in this state until it is ready to be filled.
-    * Jorge noted on 2/12/2023 that this step did not work; he reported that when he clicked **PUMP** nothing happened. Instead, he had to “manually” enter the PV name associated with this command and changed from 0 to 1. He speculated that this was most likely due to a CS Studio problem. +
 ===== Venting the Chamber ===== ===== Venting the Chamber =====
  
 +From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure
 +  * that the PPACs have been unbiased,
 +  * that this pumping station has been isolated by having the gate valves **D2426 BGV** and **D2436 BGV** closed, and that the IG has been turned off, and
 +  * that the turbo pump gate valve **TVG** is closed.
 +
 +The TMP can be turned off at this time.
 +
 +To vent the chamber:
 +  - Put the GHS in vent mode by clicking **VENT** (valves #5 and #6 are open),
 +  - monitor **RBT_BTS32:BPG_D2430:VP_RD** and **S800_GHS:PI_D2431:V_RD_AB** in a data browser,
 +  - close **RV**, the valve to the roughing pump, and
 +  - open **Vent** valve to start venting.
 +
 +The PPAC pressure S800_GHS:PI_D2431:V_RD_AB should closely follow the chamber pressure  
 +RBT_BTS32:BPG_D2430:VP_RD
 ===== Evacuating the Chamber ===== ===== Evacuating the Chamber =====
  
venting_pumping_intermediate_image_box.txt · Last modified: 2024/01/12 09:37 by noji