This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2024/01/11 10:07] noji [Venting the Chamber] |
venting_pumping_intermediate_image_box [2024/01/11 10:09] noji [Venting the Chamber] |
||
---|---|---|---|
Line 32: | Line 32: | ||
From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure | From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure | ||
- | * that the gate valves | + | * that the gate valves |
* that the turbo pump gate valve TVG is closed. | * that the turbo pump gate valve TVG is closed. | ||
To vent the chamber: | To vent the chamber: | ||
- | - Monitor **RBT_BTS32: | + | - Monitor **RBT_BTS32: |
- close **RV**, the valve to the roughing pump, and | - close **RV**, the valve to the roughing pump, and | ||
- open **Vent**. | - open **Vent**. |