User Tools

Site Tools


venting_pumping_intermediate_image_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
venting_pumping_intermediate_image_box [2024/01/11 10:07]
noji [Venting the Chamber]
venting_pumping_intermediate_image_box [2024/01/11 10:09]
noji [Venting the Chamber]
Line 32: Line 32:
  
 From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure   From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure  
-  * that the gate valves named D2426 BGV and D2436 BGV are closed, and that the IG is off, and+  * that the gate valves **D2426 BGV** and **D2436 BGV** are closed, and that the IG is off, and
   * that the turbo pump gate valve TVG is closed.   * that the turbo pump gate valve TVG is closed.
  
 To vent the chamber: To vent the chamber:
-  - Monitor **RBT_BTS32:BPG_D2430:VP_RD** and **S800_GHS:PI_D2431:V_RD_AB** in data browser,+  - Monitor **RBT_BTS32:BPG_D2430:VP_RD** and **S800_GHS:PI_D2431:V_RD_AB** in data browser,
   - close **RV**, the valve to the roughing pump, and   - close **RV**, the valve to the roughing pump, and
   - open **Vent**.   - open **Vent**.
venting_pumping_intermediate_image_box.txt ยท Last modified: 2024/01/12 09:37 by noji