User Tools

Site Tools


venting_pumping_intermediate_image_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
venting_pumping_intermediate_image_box [2024/01/11 10:09]
noji [Venting the Chamber]
venting_pumping_intermediate_image_box [2024/01/11 10:12]
noji [Venting the Chamber]
Line 31: Line 31:
 ===== Venting the Chamber ===== ===== Venting the Chamber =====
  
-From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure  +From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure 
 +  * that the PPACs have been unbiased,
   * that the gate valves **D2426 BGV** and **D2436 BGV** are closed, and that the IG is off, and   * that the gate valves **D2426 BGV** and **D2436 BGV** are closed, and that the IG is off, and
   * that the turbo pump gate valve TVG is closed.   * that the turbo pump gate valve TVG is closed.
venting_pumping_intermediate_image_box.txt · Last modified: 2024/01/12 09:37 by noji