===== Venting the Chamber ===== | ===== Venting the Chamber ===== | ||
- | From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure | + | From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure |
- | * that the gate valves **D2426 BGV** and **D2436 BGV** are closed, and that the IG is off, and | + | * that the PPACs have been unbiased, |
+ | * that this pumping station has been isolated by having | ||
* that the turbo pump gate valve TVG is closed. | * that the turbo pump gate valve TVG is closed. | ||