===== Emptying Detectors ===== | ===== Emptying Detectors ===== | ||
- Set “PPAC Setpoint” to 0 Torr. | - Set “PPAC Setpoint” to 0 Torr. | ||
- | - Click **EMPTY** on the “GHS_II-PPAC_Main” page to begin pumping out the gas quickly. | + | - Click **EMPTY** on the “GHS_II-PPAC_Main” page to open valves #3 and #4 which will allow for pumping out the gas quickly. |
- | - When “PPAC Pressure” reads < 0.1 Torr, click **MAN** and then **AUTO**. This will release the remaining gas into the diagnostics box. | + | - When “PPAC Pressure” reads < 0.1 Torr, turn off IG and click **MAN** and then **AUTO**. This will open valve #6 to release the remaining gas into the diagnostics box. |
- Monitor D2340 pumping station and ensure the TMP stays on and TGV remains open. If not, contact the Vacuum Operation group. | - Monitor D2340 pumping station and ensure the TMP stays on and TGV remains open. If not, contact the Vacuum Operation group. | ||
- | - Valves #1-5 should be closed and valve #6 should remain open. From this state click PUMP to enter pump mode and leave the system in this state until it is ready to be filled. | + | - Valves #1-5 should be closed and valve #6 should remain open. From this state click **VENT** and then **PUMP** to enter pump mode and leave the system in this state until it is ready to be filled. |
- | * Jorge noted on 2/12/2023 that this step did not work; he reported that when he clicked **PUMP** nothing happened. Instead, he had to “manually” enter the PV name associated with this command and changed from 0 to 1. He speculated that this was most likely due to a CS Studio problem. | + | |
===== Venting the Chamber ===== | ===== Venting the Chamber ===== | ||
- | From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure | + | From the S800 Main Vacuum page, go to the Intermediate Image - RBT_BTS32 D2430 Pumping Station page, and ensure |
- | * that the gate valves **D2426 BGV** and **D2436 BGV** are closed, and that the IG is off, and | + | * that the PPACs have been unbiased, |
+ | * that this pumping station has been isolated by having | ||
* that the turbo pump gate valve TVG is closed. | * that the turbo pump gate valve TVG is closed. | ||