venting_pumping_intermediate_image_box [2024/01/11 10:29] noji [Emptying Detectors] |
venting_pumping_intermediate_image_box [2024/01/11 10:33] noji [Venting the Chamber] |
||
---|---|---|---|
Line 24: | Line 24: | ||
- Set “PPAC Setpoint” to 0 Torr. | - Set “PPAC Setpoint” to 0 Torr. | ||
- Click **EMPTY** on the “GHS_II-PPAC_Main” page to open valves #3 and #4 which will allow for pumping out the gas quickly. | - Click **EMPTY** on the “GHS_II-PPAC_Main” page to open valves #3 and #4 which will allow for pumping out the gas quickly. | ||
- | - When “PPAC Pressure” reads < 0.1 Torr, click **MAN** and then **AUTO**. This will release the remaining gas into the diagnostics box. | + | - When “PPAC Pressure” reads < 0.1 Torr, turn off IG and click **MAN** and then **AUTO**. This will open valve #6 to release the remaining gas into the diagnostics box. |
- Monitor D2340 pumping station and ensure the TMP stays on and TGV remains open. If not, contact the Vacuum Operation group. | - Monitor D2340 pumping station and ensure the TMP stays on and TGV remains open. If not, contact the Vacuum Operation group. | ||
- | - Valves #1-5 should be closed and valve #6 should remain open. From this state click PUMP to enter pump mode and leave the system in this state until it is ready to be filled. | + | - Valves #1-5 should be closed and valve #6 should remain open. From this state click **VENT** and then **PUMP** to enter pump mode and leave the system in this state until it is ready to be filled. |
- | * Jorge noted on 2/12/2023 that this step did not work; he reported that when he clicked **PUMP** nothing happened. Instead, he had to “manually” enter the PV name associated with this command and changed from 0 to 1. He speculated that this was most likely due to a CS Studio problem. | + | |
===== Venting the Chamber ===== | ===== Venting the Chamber ===== | ||
Line 37: | Line 35: | ||
To vent the chamber: | To vent the chamber: | ||
- | - Monitor | + | - Put the GHS in vent mode by clicking **VENT**, |
+ | - monitor | ||
- close **RV**, the valve to the roughing pump, and | - close **RV**, the valve to the roughing pump, and | ||
- open **Vent**. | - open **Vent**. |