This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2024/01/11 10:32] noji [Emptying Detectors] |
venting_pumping_intermediate_image_box [2024/01/11 10:33] noji [Venting the Chamber] |
||
---|---|---|---|
Line 35: | Line 35: | ||
To vent the chamber: | To vent the chamber: | ||
- | - Monitor | + | - Put the GHS in vent mode by clicking **VENT**, |
+ | - monitor | ||
- close **RV**, the valve to the roughing pump, and | - close **RV**, the valve to the roughing pump, and | ||
- open **Vent**. | - open **Vent**. |